G.E.S Projects

Asset Condition Assessment Engen Lease Site

Tekoa Consulting Engineers appointed Global Integrity Solutions Consulting (Pty) Ltd to deliver a Pre-Feasibility Study (FEL 2) to conduct a condition assessment of the existing infrastructure at the Engen Pty Ltd Lease Site on behalf of the TNPA, Port of Richards Bay. Tanks, pipelines Remaining Useful Life (RUL) needed to be determined and recommendations made to the asset owner for Short- and Long-Term planning.

Global Integrity Solutions Consulting (Pty) Ltd

Bheki Ngcobo

+27 711 350 662

2018

Island View Precinct Asset Condition Assessment

 Global Integrity Solutions Consulting (Pty) Ltd were appointed by the Tekoa Consulting Engineers on behalf of Transnet National Ports Authority (TNPA) to conduct a comprehensive Asset Condition Assessment on 17 sites within the Island View Precinct. The purpose of the exercise was to determine the present condition of the asset, determine its Remaining Useful Life (RUL) and advice the Asset Owner on decisions around the short- and long-term planning for each of the sites in relation to the Port Development Framework Plan. With infrastructure on the sites ranging from petrochemical tanks, pump stations, process pipework, boilers, compressors and related heavy-duty industrial equipment, the multi-disciplinary team applied sector specific standards to successfully complete the following outcomes:

  • Technical condition assessment
  • Life-time extension evaluation
  • Technical qualification for extension
  • Preparation for obsolescent equipment
  • Estimation of costs for the lifetime extension
  • State of Regulatory compliance

Global Integrity Solutions Consulting (Pty) Ltd

Bheki Ngcobo

+27 711 350 662

2018 to 2019

Tank Farm Project

Scope of work was to evaluate the following:

  • Tank Engineering Calculations and Engineering drawings for 5000 m3 and 2500 m3
  • Check design compliance to code – including nozzle sizing, staircase
  • Pipe sizing and pump sizing for the pipeline
  • Routing and supports
  • Stress Analysis – to be done externally

Maninga Engineering

Skhulile Mhasengo

+27 834 846 583

2020

Fall Arrest Structure Analysis

To perform the engineering design analysis of the fall arrest structure

Global Integrity Solutions Consulting (Pty) Ltd

Bheki Ngcobo

+27 711 350 662

 2019

HYDROTEST MANIFOLD

Design calculations and engineering drawings generally in accordance with the requirements of ASME B31.3 

NXA Technical Solutions

Zenzele Jila

+27 711 477 813

2019

UMzimkhulu Treated Timbers Pressure vessel

Design calculations and engineering drawings for pressure vessel CCA treating Plant.

Kinloch’s Engineering

Clint Jody Kinloch

+27 813 715 329

 2015

Engen Refinery Structural Steel work

Design calculations and engineering shop drawings pipe rack structural work.

Kinloch’s Engineering

Clint Jody Kinloch

+27 813 715 329

2014

Indian Ocean Terminal Storage Tank

Integrity inspection & Design calculations and engineering drawings contains the evaluation of the suitability for continued services and assessment of the maximum filling height or maximum capacity for the concerned tank in accordance with API650 and API 12C/653 which is located along the coast of Durban, Indian Ocean Terminal. The rules given in this standard are minimum requirements and are not to be interpreted as approving, recommending, or endorsing any specific design or limiting the methods of inspection, repair, alteration, or reconstruction. Where seem necessary, personnel with proven experience in tank design may consider the use of other codes since API650 is not considered all-inclusive. In such case, this report will refer to the applied standard and describe the reason of deviation to the API650, API 12C/ 653.

Global Integrity Solutions Consulting (Pty) Ltd

Bheki Ngcobo

+27 711 350 662

 2019

Basil read Aircraft Simulator Design and Project Management

 Design and drafting services for Aircraft Simulator

  • All construction to be in accordance with ASME VIII Div.1 & SANS 1431 Grade 350WA
  • Generate fabrication / shop drawings of Aircraft Simulator
  • Issue design package

Geonile Engineering

Clement Dube

+27 842 360 947

2014 to 2015

Sasol ERP Pig Receiver Project Management

Fabrication and Installation of the gas pipeline and walkway platform structural work.

Melron Group

Tyron Kopman

+231 459 1540

 2014

Dunlop Industrial 4” steam pipeline

Design calculations and Isometric drawings steam pipe

Kinloch’s Engineering

Clint Jody Kinloch

+2781 371 5329

2012